Winspear Construction was awarded the contract from the VA Medical Center in August 2018. The main goal of this project is to remove existing flooring and wall base, complete floor preparation, providing and installing new flooring, porcelain tile work, new doors, bathroom partitions, cabinetry with adjustable shelves and drawers, new urinals, new lavatories and faucets, new light fixtures, carpentry, signal work, electrical work, wall base, and painting.

Winspear Construction was tasked with: removing existing flooring and wall bases, floor preparation to accept new flooring material, providing and installing sheet vinyl, porcelain tile, carpet tile, wall base, removal of wall batt strips, prepping and painting, installing new lavatories and faucets, and installing new light fixtures.

Completed May 2019