Replace Finishes Building 115, 2nd Floor

Replace Finishes Building 115, 2nd Floor

Winspear Construction was awarded the contract from the VA Medical Center. The main goal of this project is to remove existing flooring and wall base, complete floor preparation, providing and installing new flooring, porcelain tile work, new doors, bathroom partitions, cabinetry with adjustable shelves and drawers, new urinals, new lavatories and faucets, new light fixtures, carpentry, signal work, electrical work, wall base, and painting.

Winspear Construction was tasked with removing existing flooring, floor preparation to accept new flooring material; providing and installing sheet vinyl, porcelain tile, carpet tile, wall base, removal of wall batt strips, prepping and painting.

Overall the project was a huge success and the client is ecstatic to have a newly remodeled floor.