Boise VA National Telehealth Hub
To provide administrative and clinical office space for a national telehealth care hub, the Veterans Administration contracted with Winspear Construction to construct a 17,120 SF addition to the Boise Regional Benefit Office located on the Boise VA Medical Center campus. This project involved the construction of a second-floor addition along with supporting access stairways and…
View ProjectArrowrock Dam, Gate No. 2 Guide Rail Replacement
Work for the Bureau of Reclamation at Arrowrock Dam included, demolition and disposal of the existing 10 ton gantry crane and its components from crest of dam and demo and replace four guide rail sections on Gate No. 2 and all anchors and hardware associated with the removed guide rail sections.
View ProjectUSCG Rebuild ATON
Winspear Construction is the General Contractor for the work to install, replace, or remove aid-to-navigation (ATON) structures in Southern California. Work included the removal of an ATON steel pile at the Isthmus Cove off the shore of Catalina Island. This removed pile was to be replaced with a new 30’ FRP pile, which required drilling…
View ProjectReno VA Parking Garage
Winspear Construction has been the General Contractor for the demolition of four commercial building structures and construction of a new 4 level, 326 parking space, cast in place concrete parking structure at the Veterans Hospital in Reno, Nevada. We were awarded the contract for this project at the beginning of February 2019 and began demolition…
View ProjectMHAFB Repair, Renovation & Addition Bldg 278
Winspear was awarded the contract to provide renovations and a remodel to the Mountain Home Air Force Base. This project provides a full and complete design for repairs and addition to 389 Fighter Squadron Operations (Squad Ops) Facility at Building 278 on Mountain Home Air Force Base (MHAFB). The project includes an approximate 49-foot by…
View ProjectComplete Restoration Services
Winspear was contracted to provide demolition and reconstruction of 10,000 SF of existing building for processing and office use. They were contracted in January 2018. The scope of work included: concrete saw cutting, structural steel, handrails, finish carpentry, joint sealants, insulation, doors & hardware, glazing, windows, framing, dry wall, acoustical ceilings, flooring, painting, specialties, fire…
View ProjectCentennial High School Track & Stadium Improvements
Winspear was contracted in June 2017 to improve the track of Centennial High School in Boise, Idaho. This project included removal of existing drainage structures, construction of two large seepage beds (60’ x 10’ x 10’), sand and grease traps, and catch basins. We installed two drywells that were 12 feet deep and include construction…
View ProjectReplace Finishes Building 115, 2nd Floor
Winspear Construction was awarded the contract from the VA Medical Center in August 2018. The main goal of this project is to remove existing flooring and wall base, complete floor preparation, providing and installing new flooring, porcelain tile work, new doors, bathroom partitions, cabinetry with adjustable shelves and drawers, new urinals, new lavatories and faucets,…
View ProjectPlantation Island Bridge Restoration
Winspear Construction was awarded a Contract from the Idaho Foundation of Parks and Lands to restore both bridge approaches for the Plantation Island Bridge. Located on the Boise river in Boise, Idaho. The bridge is a key component of the Boise Greenbelt. A twenty-five mile pedestrian path along the river that had been removed due…
View ProjectCamels Back Chute Stabilization
The City of Boise contracted with Winspear Construction to design a solution to mitigate heavy erosion in a public-use area in September of 2016. This project required a Performance and Payment Bond and occurred on one of the most iconic hills in Boise, Camel’s Back. At the forefront of the project was a plan for…
View Project