Plantation Island Bridge Restoration

Winspear Construction was awarded a Contract from the Idaho Foundation of Parks and Lands to restore both bridge approaches for the Plantation Island Bridge, on the Boise river, in Boise, Idaho. The bridge is a key component of the Boise Greenbelt, a twenty-five mile pedestrian path along the river, that had been removed due to…

View Project

Building 88 Expansion

Government Agency/Company: Department of Veterans Affairs Network Contracting Office 20 Contract Number: VA260-17-C-0011 Description of Contract Scope: Demolition of existing site structures for excavation of new footings of placement of slab on grade for 2,600 SF addition consisting of structural steel, metal framing, wood roof joists and trusses, brick façade, and new TPO roofing system.…

View Project

MHAFB Repair, Renovation & Addition Bldg 278

This project provides a full and complete design for repairs and addition to 389 Fighter Squadron Operations (Squad Ops) Facility at Building 278 on Mountain Home Air Force Base (MHAFB). The project includes an approximate 49-foot by 35-foot (1,700 square foot) addition to the existing secured area and an approximate 16-foot by 35-foot (560 square…

View Project

VA Parking Garage

Construct New Parking Structure Government Agency/Company: Department of Veterans Affairs Network Contracting Office 20 Contract Number: VA260-17-C-0011 Description of Contract Scope: Mass excavation of 32,000 CY of soil and construction of 10,000 square foot temporary shoring soil nail retaining wall. Drill and installation of 107 concrete caissons and cast in place footings with critical embed…

View Project

Centennial High School Track & Stadium Improvements

Project was located at one of the local High Schools that included removal of existing drainage structures, construction of two large seepage beds (60’ x 10’ x 10’), sand and grease traps, and catch basins. We installed two drywells that were 12 feet deep and include construction of a 120 French drain. The job also…

View Project

Nampa Fish Hatchery Raceway Rehab

This project presented a unique set of challenges that Winspear Construction crews overcame through hard work, creativity, & persistence. The Fish Hatchery was required to remain open during the rehabilitation work. IDFG provided constraining work windows that allotted Winspear Construction a definitive amount of time in each raceway. This allowed the necessary space for the…

View Project

Residential Exterior Re-design

Winspear Construction began the Design phase of this project which included the re-engineering of an existing large-scale retaining wall, the design of a new concrete step-down wall with custom fencing, a grading and excavation plan for water mitigation, and hardscape and landscape re-design.

View Project

Camels Back Chute Stabilization

The City of Boise contracted with Winspear Construction to design a solution to mitigate heavy erosion in a public-use area. This project required a Performance and Payment Bond and occurred on one of the most iconic hills in Boise-the Camel’s Back. At the forefront of the project was a plan for safety as large-scale excavation…

View Project

BLM Xeriscape

This large-scale Federal construction project required a Performance and Payment Bond and included a wide range of disciplines. Winspear Construction managed this project and employed a large sub-contracting firm to complete the landscaping. As the Construction Manager for this project, Winspear Construction was responsible for contracting with sub-contractors, job-site safety, permitting, and delegation of the…

View Project