Arrowrock Dam, Gate No. 2 Guide Rail Replacement

Work for the Bureau of Reclamation at Arrowrock Dam included, demolition and disposal of the existing 10 ton gantry crane and its components from crest of dam and demo and replace four guide rail sections on Gate No. 2 and all anchors and hardware associated with the removed guide rail sections.

View Project

Replace Finishes Building 115, 2nd Floor

Winspear Construction was awarded the contract from the VA Medical Center in August 2018. The main goal of this project is to remove existing flooring and wall base, complete floor preparation, providing and installing new flooring, porcelain tile work, new doors, bathroom partitions, cabinetry with adjustable shelves and drawers, new urinals, new lavatories and faucets,…

View Project

Boise VA Hospital Expansion Building 88

  Winspear was awarded the contract to expand the Boise VA Hospital in May of 2017. This project included: demolition of existing site structures for excavation of new footings of placement of slab on grade for 2,600 SF addition consisting of structural steel, metal framing, wood roof joists and trusses, brick façade, and new TPO…

View Project

Nampa Fish Hatchery Raceway Rehab

Winspear Construction was awarded the contract to rehabilitate the walls and floors of the Nampa Fish Hatchery in June 2017. This project presented a unique set of challenges that Winspear Construction crews overcame through hard work, creativity, & persistence. The Fish Hatchery was required to remain open during the rehabilitation work. IDFG provided constraining work…

View Project