Winspear Construction was awarded the contract from the VA Medical Center in August 2018. The main goal of this project is to remove existing flooring and wall base, complete floor preparation, providing and installing new flooring, porcelain tile work, new doors, bathroom partitions, cabinetry with adjustable shelves and drawers, new urinals, new lavatories and faucets,…

View Project

  Winspear was awarded the contract to expand the Boise VA Hospital in May of 2017. This project included: demolition of existing site structures for excavation of new footings of placement of slab on grade for 2,600 SF addition consisting of structural steel, metal framing, wood roof joists and trusses, brick façade, and new TPO…

View Project

Winspear Construction was awarded the contract to rehabilitate the walls and floors of the Nampa Fish Hatchery in June 2017. This project presented a unique set of challenges that Winspear Construction crews overcame through hard work, creativity, & persistence. The Fish Hatchery was required to remain open during the rehabilitation work. IDFG provided constraining work…

View Project

The Terraces of Boise contracted with Winspear Construction to fix several sewer lines that were installed incorrectly or had poor compaction.

View Project