Winspear Construction has been the General Contractor for the demolition of four commercial building structures and construction of a new 4 level, 326 parking space, cast in place concrete parking structure at the Veterans Hospital in Reno, Nevada. We were awarded the contract for this project at the beginning of February 2019 and began demolition…

View Project

Construct New Parking Structure Government Agency/Company: Department of Veterans Affairs Network Contracting Office 20 Contract Number: VA260-17-C-0011 Description of Contract Scope: Mass excavation of 32,000 CY of soil and construction of 10,000 square foot temporary shoring soil nail retaining wall. Drill and installation of 107 concrete caissons and cast in place footings with critical embed…

View Project

This project provides a full and complete design for repairs and addition to 389 Fighter Squadron Operations (Squad Ops) Facility at Building 278 on Mountain Home Air Force Base (MHAFB). The project includes an approximate 49-foot by 35-foot (1,700 square foot) addition to the existing secured area and an approximate 16-foot by 35-foot (560 square…

View Project

Government Agency/Company: Department of Veterans Affairs Network Contracting Office 20 Contract Number: VA260-17-C-0011 Description of Contract Scope: Demolition of existing site structures for excavation of new footings of placement of slab on grade for 2,600 SF addition consisting of structural steel, metal framing, wood roof joists and trusses, brick façade, and new TPO roofing system.…

View Project

Winspear Construction was awarded the contract from the VA Medical Center. The main goal of this project is to remove existing flooring and wall base, complete floor preparation, providing and installing new flooring, porcelain tile work, new doors, bathroom partitions, cabinetry with adjustable shelves and drawers, new urinals, new lavatories and faucets, new light fixtures,…

View Project

Demolition and reconstruction of 10,000 SF of existing building for processing and office use. Scope included concrete saw cutting, structural steel, handrails, finish carpentry, joint sealants, insulation, doors & hardware, glazing, windows, framing, dry wall, acoustical ceilings, flooring, painting, specialties, fire protection, plumbing, HVAC, electrical, telecommunications, and security systems.

View Project