Boise VA National Telehealth Hub

To provide administrative and clinical office space for a national telehealth care hub, the Veterans Administration contracted with Winspear Construction to construct a 17,120 SF addition to the Boise Regional Benefit Office located on the Boise VA Medical Center campus.  This project involved the construction of a second-floor addition along with supporting access stairways and…

View Project

Reno VA Parking Garage

Winspear Construction has been the General Contractor for the demolition of four commercial building structures and construction of a new 4 level, 326 parking space, cast in place concrete parking structure at the Veterans Hospital in Reno, Nevada. We were awarded the contract for this project at the beginning of February 2019 and began demolition…

View Project

Boise VA Parking Garage

Construct New Parking Structure Winspear Construction was the General Contractor for this three-story precast parking structure located in Boise, Idaho. We were awarded the contract in April of 2017. This project consisted of: mass excavation of 32,000 cubic yards of soil, construction of 10,000 square foot temporary shoring soil nail retaining wall, drill and installation…

View Project

Owyhee High School Site Work

Winspear Construction was subcontracted by Petra to preform site work at Owyhee High School. This included: standard concrete flatwork and sidewalks, heavy-duty concrete paving, layout and installation of reinforcing steel, pedestrian ramps and truncated domes, drive approaches, concrete aprons at light poles, and isolation joints.

View Project

MHAFB Repair, Renovation & Addition Bldg 278

Winspear was awarded the contract to provide renovations and a remodel to the Mountain Home Air Force Base. This project provides a full and complete design for repairs and addition to 389 Fighter Squadron Operations (Squad Ops) Facility at Building 278 on Mountain Home Air Force Base (MHAFB). The project includes an approximate 49-foot by…

View Project

Centennial High School Track & Stadium Improvements

Winspear was contracted in June 2017 to improve the track of Centennial High School in Boise, Idaho. This project included removal of existing drainage structures, construction of two large seepage beds (60’ x 10’ x 10’), sand and grease traps, and catch basins. We installed two drywells that were 12 feet deep and include construction…

View Project

Replace Finishes Building 115, 2nd Floor

Winspear Construction was awarded the contract from the VA Medical Center in August 2018. The main goal of this project is to remove existing flooring and wall base, complete floor preparation, providing and installing new flooring, porcelain tile work, new doors, bathroom partitions, cabinetry with adjustable shelves and drawers, new urinals, new lavatories and faucets,…

View Project

Plantation Island Bridge Restoration

Winspear Construction was awarded a Contract from the Idaho Foundation of Parks and Lands to restore both bridge approaches for the Plantation Island Bridge. Located on the Boise river in Boise, Idaho. The bridge is a key component of the Boise Greenbelt. A twenty-five mile pedestrian path along the river that had been removed due…

View Project

Boise VA Hospital Expansion Building 88

  Winspear was awarded the contract to expand the Boise VA Hospital in May of 2017. This project included: demolition of existing site structures for excavation of new footings of placement of slab on grade for 2,600 SF addition consisting of structural steel, metal framing, wood roof joists and trusses, brick façade, and new TPO…

View Project

Settlers Canal Re-surfacing

Winspear Construction contracted with this client to resurface 522 feet of irrigation canal. The water from the canal feeds several farms throughout Southwestern Idaho and is vital to these farms. The original shot-crete was deteriorated and was removed by the canal owners in preparation for re-surfacing. Winspear Construction re-shaped and graded the sub-material and re-surfaced…

View Project