Replace Finishes Building 115, 2nd Floor

Winspear Construction was awarded the contract from the VA Medical Center. The main goal of this project is to remove existing flooring and wall base, complete floor preparation, providing and installing new flooring, porcelain tile work, new doors, bathroom partitions, cabinetry with adjustable shelves and drawers, new urinals, new lavatories and faucets, new light fixtures,…

View Project

Plantation Island Bridge Restoration

Winspear Construction was awarded a Contract from the Idaho Foundation of Parks and Lands to restore both bridge approaches for the Plantation Island Bridge, on the Boise river, in Boise, Idaho. The bridge is a key component of the Boise Greenbelt, a twenty-five mile pedestrian path along the river, that had been removed due to…

View Project

Building 88 Expansion

Government Agency/Company: Department of Veterans Affairs Network Contracting Office 20 Contract Number: VA260-17-C-0011 Description of Contract Scope: Demolition of existing site structures for excavation of new footings of placement of slab on grade for 2,600 SF addition consisting of structural steel, metal framing, wood roof joists and trusses, brick façade, and new TPO roofing system.…

View Project

MHAFB Repair, Renovation & Addition Bldg 278

This project provides a full and complete design for repairs and addition to 389 Fighter Squadron Operations (Squad Ops) Facility at Building 278 on Mountain Home Air Force Base (MHAFB). The project includes an approximate 49-foot by 35-foot (1,700 square foot) addition to the existing secured area and an approximate 16-foot by 35-foot (560 square…

View Project

Complete Restoration Services

Demolition and reconstruction of 10,000 SF of existing building for processing and office use. Scope included concrete saw cutting, structural steel, handrails, finish carpentry, joint sealants, insulation, doors & hardware, glazing, windows, framing, dry wall, acoustical ceilings, flooring, painting, specialties, fire protection, plumbing, HVAC, electrical, telecommunications, and security systems.

View Project

Centennial High School Track & Stadium Improvements

Project was located at one of the local High Schools that included removal of existing drainage structures, construction of two large seepage beds (60’ x 10’ x 10’), sand and grease traps, and catch basins. We installed two drywells that were 12 feet deep and include construction of a 120 French drain. The job also…

View Project

Residential Exterior Re-design

Winspear Construction began the Design phase of this project which included the re-engineering of an existing large-scale retaining wall, the design of a new concrete step-down wall with custom fencing, a grading and excavation plan for water mitigation, and hardscape and landscape re-design.

View Project

Camels Back Chute Stabilization

The City of Boise contracted with Winspear Construction to design a solution to mitigate heavy erosion in a public-use area. This project required a Performance and Payment Bond and occurred on one of the most iconic hills in Boise-the Camel’s Back. At the forefront of the project was a plan for safety as large-scale excavation…

View Project

Salmon River Reclamation

Idaho Department of Lands contracted with Winspear Construction to plan, manage, and perform the removal of several tons of concrete and steel debris from the river bank of the Salmon River in Heyburn, ID. The project entailed the removal of several tons of concrete from the river bank of the Salmon River. Winspear Construction used…

View Project

Settlers Canal Re-surfacing

Winspear Construction contracted with this client to resurface 522 feet of irrigation canal. The water from the canal feeds several farms throughout Southwestern Idaho and is vital to these farms. The original shot-crete was deteriorated and was removed by the canal owners in preparation for re-surfacing. Winspear Construction re-shaped and graded the sub-material and re-surfaced…

View Project