Boise VA – Expand Parking Lot #7 and Convert Sheep Pen

Winspear Construction was awarded a contract from the Department of Veteran Affairs to increase the parking spaces at the VA campus in Boise, Idaho. The scope at West side of Parking Lot #7 consists of removing concrete pad and connecting sidewalk, existing trees, and landscape within the project area. Work to the East of Lot…

View Project

Boise VA National Telehealth Hub

Winspear Construction was contracted by the Department of Veteran Affairs to add approximately 17,120 new sf to the Boise Regional Benefit Office. This second story addition of telehealth office space includes new staircases, elevators, utilities, furnishings, and roofing.

View Project

Reno VA Parking Garage

Winspear Construction has been the General Contractor for the demolition of four commercial building structures and construction of a new 4 level, 326 parking space, cast in place concrete parking structure at the Veterans Hospital in Reno, Nevada. We were awarded the contract for this project at the beginning of February 2019 and began demolition…

View Project

VA Parking Garage

Construct New Parking Structure Winspear Construction was the General Contractor for this three-story precast parking structure located in Boise, Idaho. We were awarded the contract in April of 2017. This project consisted of: mass excavation of 32,000 cubic yards of soil, construction of 10,000 square foot temporary shoring soil nail retaining wall, drill and installation…

View Project

Replace Finishes Building 115, 2nd Floor

Winspear Construction was awarded the contract from the VA Medical Center in August 2018. The main goal of this project is to remove existing flooring and wall base, complete floor preparation, providing and installing new flooring, porcelain tile work, new doors, bathroom partitions, cabinetry with adjustable shelves and drawers, new urinals, new lavatories and faucets,…

View Project

Boise VA Hospital Expansion Building 88

  Winspear was awarded the contract to expand the Boise VA Hospital in May of 2017. This project included: demolition of existing site structures for excavation of new footings of placement of slab on grade for 2,600 SF addition consisting of structural steel, metal framing, wood roof joists and trusses, brick façade, and new TPO…

View Project