Boise VA National Telehealth Hub

To provide administrative and clinical office space for a national telehealth care hub, the Veterans Administration contracted with Winspear Construction to construct a 17,120 SF addition to the Boise Regional Benefit Office located on the Boise VA Medical Center campus.  This project involved the construction of a second-floor addition along with supporting access stairways and…

View Project

USCG Rebuild ATON

Winspear Construction is the General Contractor for the work to install, replace, or remove aid-to-navigation (ATON) structures in Southern California. Work included the removal of an ATON steel pile at the Isthmus Cove off the shore of Catalina Island. This removed pile was to be replaced with a new 30’ FRP pile, which required drilling…

View Project

Reno VA Parking Garage

Winspear Construction has been the General Contractor for the demolition of four commercial building structures and construction of a new 4 level, 326 parking space, cast in place concrete parking structure at the Veterans Hospital in Reno, Nevada. We were awarded the contract for this project at the beginning of February 2019 and began demolition…

View Project

Boise VA Parking Garage

Construct New Parking Structure Winspear Construction was the General Contractor for this three-story precast parking structure located in Boise, Idaho. We were awarded the contract in April of 2017. This project consisted of: mass excavation of 32,000 cubic yards of soil, construction of 10,000 square foot temporary shoring soil nail retaining wall, drill and installation…

View Project

Nampa Fish Hatchery Raceway Rehab

Winspear Construction was awarded the contract to rehabilitate the walls and floors of the Nampa Fish Hatchery in June 2017. This project presented a unique set of challenges that Winspear Construction crews overcame through hard work, creativity, & persistence. The Fish Hatchery was required to remain open during the rehabilitation work. IDFG provided constraining work…

View Project