Winspear Construction has been the General Contractor for the demolition of four commercial building structures and construction of a new 4 level, 326 parking space, cast in place concrete parking structure at the Veterans Hospital in Reno, Nevada. We were awarded the contract for this project at the beginning of February 2019 and began demolition…

View Project

Construct New Parking Structure Government Agency/Company: Department of Veterans Affairs Network Contracting Office 20 Contract Number: VA260-17-C-0011 Description of Contract Scope: Mass excavation of 32,000 CY of soil and construction of 10,000 square foot temporary shoring soil nail retaining wall. Drill and installation of 107 concrete caissons and cast in place footings with critical embed…

View Project

Winspear Construction was awarded a Contract from the Idaho Foundation of Parks and Lands to restore both bridge approaches for the Plantation Island Bridge, on the Boise river, in Boise, Idaho. The bridge is a key component of the Boise Greenbelt, a twenty-five mile pedestrian path along the river, that had been removed due to…

View Project

The City of Boise contracted with Winspear Construction to design a solution to mitigate heavy erosion in a public-use area. This project required a Performance and Payment Bond and occurred on one of the most iconic hills in Boise-the Camel’s Back. At the forefront of the project was a plan for safety as large-scale excavation…

View Project

This project provides a full and complete design for repairs and addition to 389 Fighter Squadron Operations (Squad Ops) Facility at Building 278 on Mountain Home Air Force Base (MHAFB). The project includes an approximate 49-foot by 35-foot (1,700 square foot) addition to the existing secured area and an approximate 16-foot by 35-foot (560 square…

View Project

Government Agency/Company: Department of Veterans Affairs Network Contracting Office 20 Contract Number: VA260-17-C-0011 Description of Contract Scope: Demolition of existing site structures for excavation of new footings of placement of slab on grade for 2,600 SF addition consisting of structural steel, metal framing, wood roof joists and trusses, brick façade, and new TPO roofing system.…

View Project

This large-scale Federal construction project required a Performance and Payment Bond and included a wide range of disciplines. Winspear Construction managed this project and employed a large sub-contracting firm to complete the landscaping. As the Construction Manager for this project, Winspear Construction was responsible for contracting with sub-contractors, job-site safety, permitting, and delegation of the…

View Project