At the intersection of Linder and Deer Flat, Winspear is installing curb and gutter with a Wirtgen SP15 slip form paver, 5′-10′ wide sidewalks with associated ADA compliant pedestrian ramps, and storm water drain inlets.

View Project

Located approximately 15 miles from Bruneau, Idaho is the Bruneau Overlook Recreation Area. Winspear was contracted to improve the existing area including an ADA decorative concrete trail, interpretive signage, cable railing, and associated site development.

View Project

Components of work for the American Falls Spillway Repair include saw cutting the existing concrete as well as removing and replacing the existing concrete for the spillway, stilling basin, and adits. This project also consists of: replacing the damaged reinforcing with new reinforcing, drilling holes to install epoxy bonded anchors, concrete formwork installation and removal,…

View Project

Winspear Construction has been the General Contractor for the demolition of four commercial building structures and construction of a new 4 level, 326 parking space, cast in place concrete parking structure at the Veterans Hospital in Reno, Nevada. We were awarded the contract for this project at the beginning of February 2019 and began demolition…

View Project

Construct New Parking Structure Winspear Construction was the General Contractor for this three-story precast parking structure located in Boise, Idaho. We were awarded the contract in April of 2017. This project consisted of: mass excavation of 32,000 cubic yards of soil, construction of 10,000 square foot temporary shoring soil nail retaining wall, drill and installation…

View Project

Winspear was awarded the contract to provide renovations and a remodel to the Mountain Home Air Force Base. This project provides a full and complete design for repairs and addition to 389 Fighter Squadron Operations (Squad Ops) Facility at Building 278 on Mountain Home Air Force Base (MHAFB). The project includes an approximate 49-foot by…

View Project

Winspear was contracted to provide demolition and reconstruction of 10,000 SF of existing building for processing and office use. They were contracted in January 2018. The scope of work included: concrete saw cutting, structural steel, handrails, finish carpentry, joint sealants, insulation, doors & hardware, glazing, windows, framing, dry wall, acoustical ceilings, flooring, painting, specialties, fire…

View Project

Winspear was contracted in June 2017 to improve the track of Centennial High School in Boise, Idaho. This project included removal of existing drainage structures, construction of two large seepage beds (60’ x 10’ x 10’), sand and grease traps, and catch basins. We installed two drywells that were 12 feet deep and include construction…

View Project

Winspear Construction was awarded a Contract from the Idaho Foundation of Parks and Lands to restore both bridge approaches for the Plantation Island Bridge. Located on the Boise river in Boise, Idaho. The bridge is a key component of the Boise Greenbelt. A twenty-five mile pedestrian path along the river that had been removed due…

View Project

The City of Boise contracted with Winspear Construction to design a solution to mitigate heavy erosion in a public-use area in September of 2016. This project required a Performance and Payment Bond and occurred on one of the most iconic hills in Boise, Camel’s Back. At the forefront of the project was a plan for…

View Project