Boise VA National Telehealth Hub

To provide administrative and clinical office space for a national telehealth care hub, the Veterans Administration contracted with Winspear Construction to construct a 17,120 SF addition to the Boise Regional Benefit Office located on the Boise VA Medical Center campus.  This project involved the construction of a second-floor addition along with supporting access stairways and…

View Project

Reno VA Parking Garage

Winspear Construction has been the General Contractor for the demolition of four commercial building structures and construction of a new 4 level, 326 parking space, cast in place concrete parking structure at the Veterans Hospital in Reno, Nevada. We were awarded the contract for this project at the beginning of February 2019 and began demolition…

View Project

Boise VA Parking Garage

Construct New Parking Structure Winspear Construction was the General Contractor for this three-story precast parking structure located in Boise, Idaho. We were awarded the contract in April of 2017. This project consisted of: mass excavation of 32,000 cubic yards of soil, construction of 10,000 square foot temporary shoring soil nail retaining wall, drill and installation…

View Project

Owyhee High School Site Work

Winspear Construction was subcontracted by Petra to preform site work at Owyhee High School. This included: standard concrete flatwork and sidewalks, heavy-duty concrete paving, layout and installation of reinforcing steel, pedestrian ramps and truncated domes, drive approaches, concrete aprons at light poles, and isolation joints.

View Project

MHAFB Repair, Renovation & Addition Bldg 278

Winspear was awarded the contract to provide renovations and a remodel to the Mountain Home Air Force Base. This project provides a full and complete design for repairs and addition to 389 Fighter Squadron Operations (Squad Ops) Facility at Building 278 on Mountain Home Air Force Base (MHAFB). The project includes an approximate 49-foot by…

View Project

Complete Restoration Services

Winspear was contracted to provide demolition and reconstruction of 10,000 SF of existing building for processing and office use. They were contracted in January 2018. The scope of work included: concrete saw cutting, structural steel, handrails, finish carpentry, joint sealants, insulation, doors & hardware, glazing, windows, framing, dry wall, acoustical ceilings, flooring, painting, specialties, fire…

View Project

Centennial High School Track & Stadium Improvements

Winspear was contracted in June 2017 to improve the track of Centennial High School in Boise, Idaho. This project included removal of existing drainage structures, construction of two large seepage beds (60’ x 10’ x 10’), sand and grease traps, and catch basins. We installed two drywells that were 12 feet deep and include construction…

View Project

Plantation Island Bridge Restoration

Winspear Construction was awarded a Contract from the Idaho Foundation of Parks and Lands to restore both bridge approaches for the Plantation Island Bridge. Located on the Boise river in Boise, Idaho. The bridge is a key component of the Boise Greenbelt. A twenty-five mile pedestrian path along the river that had been removed due…

View Project

Camels Back Chute Stabilization

The City of Boise contracted with Winspear Construction to design a solution to mitigate heavy erosion in a public-use area in September of 2016. This project required a Performance and Payment Bond and occurred on one of the most iconic hills in Boise, Camel’s Back. At the forefront of the project was a plan for…

View Project

Boise VA Hospital Expansion Building 88

  Winspear was awarded the contract to expand the Boise VA Hospital in May of 2017. This project included: demolition of existing site structures for excavation of new footings of placement of slab on grade for 2,600 SF addition consisting of structural steel, metal framing, wood roof joists and trusses, brick façade, and new TPO…

View Project